Get Quote

ROI Oxair Oxygen Plant

Cost of Cylinders @ INR 250 for 24 Cylinders Per Day

No of cylinders
Per day
24x250x365
Cost of cylinders
for one year
21,90,000/-
Grand total expenses
@ 250 per cylinder for a consumption of 24 cylinders per day
21,90,000/-

Cost Benefit Analysis Oxair Plant Running Cost for 1 Year

Glass

Oxair Plant OA SS 120 (120 LPM Plant) Equivalent 24 Cylinders Per Day
Production Capacity

Note: Oxair Spec Power for 120 LPM/24 cylinders plant is 9 KWH. For this size of plant, most of the competitors
use 14 KWH spec power.
No Units Consumed in a day (For producing 24 cylinders)

9x20 = 180

Units of Electricity
Average Electricity Cost @Rs. 10 Per Unit for one year.

180x12x365 = 7,88,400

Maintenance cost for 12 months @12000 INR PM

1,44,000.00

Per Annum
Grand total expenses one Year

9,32,400.00

Glass

Savings over cylinders using Oxair Super Saver Model OASS 120: 12,57,600 (Twelve Lakhs Fifty-Seven Thousand Six hundred only) Including the CAPEX, Oxair SS 120 assured ROI is within 24-30 months.

Cost Benefit Analysis over LOX

Cost of LOX @ INR 30 Per M3 for 172 M3 Per Day (Equivalent to 24 Jumbo Cylinders)

Total LOX consumed
for one year

172x365 = 62,780 M3

Cost of LOX for one year
@ INR 30 Per M3

18,83,400

Grand total expenses
@ 172 m3 per day for equivalent
LOX of 24 cylinders per day

18,83,000.00

Glass

Savings over LOX using Oxair Super Saver Model OASS 120: 9,51,000 (Nine Lakhs Fifty-One Thousand only) Including the CAPEX, Oxair SS 120 assured ROI is within 30-36 months.